SYSTRA

Civil Engineer for Tunnels

Location RS-Belgrade
ID 2024-3566
Contract Type
Permanent
Job Family
Construction Supervision Civil

SYSTRA is one of the world's leading engineering and consultancy groups specialising in public transport and sustainable mobility. With over 10,300 employees, SYSTRA's mission is to design safe and sustainable transport solutions to bring people together, develop social inclusion and facilitate access to employment, education and leisure throughout the world.

For 65 years, the Group has been working alongside cities and regions to contribute to their development by creating, improving and modernising their infrastructure and transport systems, throughout the life cycle of their projects. SYSTRA is involved from the earliest stages of design through to the testing, deployment and maintenance phases. The company provides all its services in over 80 countries worldwide and generates 74% of its turnover internationally. With its new services, SYSTRA supports its clients and partners in their digital, ecological and energy transition, in order to invent the mobility of tomorrow.

Context

Civil Engineer for Tunnels

Missions/Main Duties

  • Controls the compliance of the performed works with the design and implements the procedures related to the quality system pertaining to the construction of metro tunnel structures. Organizes and carries out the control tests of materials used and works performed, organizes and carries out the measurements of the performed quantities of works and is responsible for keeping the documentation on the performed works;
  • Conducts a detailed review of the Contractor's plans and programs and gives recommendations to the Client, who ultimately decides on these matters. Participates in the activities of the Contractor in the planning and preparation of the dynamic work schedule by providing advice, recommendations, references to specifications, etc. Gives an opinion to the Construction Manager on the plans and programs of the Contractor Organizes the monitoring of the progress of works in accordance with the plans and programs.
  • Issues orders to the Contractor to correct defects. Ensures that the Contractor receives instructions, recommendations, approvals, etc. on time in order to avoid the delay of works and claims by the Contractor;
  • Checks whether the installed materials are provided with the necessary attestations, certificates, as well as other documentation proving the quality and whether they meet the appropriate standards;
  • Continuously monitors the actual costs and quantities of all works performed by the Contractor;
  • Reviews and provides an opinion on the submitted requests of the Contractor. Performs a price analysis for upcoming and unforeseen works and makes recommendations to the Construction Manager who then prepares the final version of the recommendation and informs the Client who ultimately decides on these matters;
  • Is responsible for reporting on the progress of the execution of the Construction Contract in the part related to the construction of tunnel structures of the metro. During the construction phase, prepares a part of the monthly and quarterly reports within the scope of his work and submits them to the Construction Manager. Provides a final report to the Construction Manager detailing the completion of all work on the tunnel structures of the metro upon the completion of the works;
  • Makes recommendations to the Contractor regarding measures to improve methods, equipment, materials, etc. For the needs of the Investor, prepares reports and reviews on the quality, quantities and values of works;
  • Conducts a detailed review of the changes to the design and measures proposed by the Contractor. Depending on the size and significance of these changes, the debatable issues must be forwarded to the Construction Manager and the Client for a final decision;
  • Participates in negotiations with the Contractor if required by the Construction Project Manager, the Client and the Investor;
  • Conducts a detailed review of reports received from the Contractor;
  • Controls and approves the as-built designs prepared by the Contractor in the part related to the construction of tunnel structures of the metro;
  • Prepares documentation and participates in the work of the commission for the technical inspection of works;
  • Participates in the work of the commission for the handover of finished works;

 

Profile/Skills

  • University degree in a relevant discipline;
  • Knowledge of the English language;
  • Advanced knowledge of working in Office packages and other software packages (e.g. AutoCAD, etc.);
  • Civil engineer for tunnels must prove that he has spent at least 5 years in the position of responsible contractor and/or expert supervision on underground metro construction projects or on road/railway tunnel projects, executed using the TBM construction method.

 

Systra is an equal opportunities company; this position is open to all applicants.

Options

Sorry the Share function is not working properly at this moment. Please refresh the page and try again later.